Monday 13 June 2011

Sentinel 7109's Boiler goes for repair

Courtesy of local company R J King, the boiler left the Midsomer Norton Station on 17th December 2010 for Mendip Steam Restoration Ltd in Stoke St Michael. Richard Philips has done a superb job replacing six tubes, sand-blasting, painting, rejointing, restudding, reassembly and more.
Boiler leaving the station on 17th Dec 2010...
...and arriving at Mendip Steam Restoration later the same day
About 420 psi hydraulic pressure showing
The result was a first hydraulic test certificate issued on 13th April by our boiler-inspector, Peter Hawkins, to say that it had satisfactorily with-stood a pressure of 412.5 psi for half an hour. (This is the first hydraulic test at 1.5 times normal working pressure to prove the workmanship and strength of the structure).

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...